1. A sample of a 2MW solar system project installed by the government in a rural field in Nigeria is loaded today. The goods will arrive in Abuja, Nigeria, around the end of March. Our engineers will go to Abuja to guide the installation of these solar system samples, and will also train local engineers one-on-one on how to install and use the solar systems in the later stages of maintenance and expansion.
2. This 2MW government project sample is from the customer who came to China to inspect our factory in August last year. In September, our engineers also went to the Nigerian project site to conduct survey work, and designed the suitable solar solution.
3. When our team was surveying rural areas in Nigeria, we found that the local transportation was very inconvenient and solar panels were easily broken during transportation. Therefore, we required all Nigerian customers to transport solar panels, batteries, etc. Packed in wooden boxes to ensure that the goods will not be damaged during transportation
4. If you also have solar projects for government, factories, hospitals, schools, or residents, please kindly contact Tanfon sales team, for your customized solar project solution.
What happen if the solar system is not tested as a complete set running before shipment?
What is your maintenance rule?
what is 360° guarantee?
Why can't the solar system be connected properly even though with installation instructions?
How to solve the after-sales problems?
What is the difference between a supplier who sells products and a supplier who sells service?
Read more commonly asked questions or learn about what solar storage is.
TANFON Solar Manufacturer since 2007, Serving More Than 160 Countries, German Technology, Global Certification.
Tanfon solar's brand mission and origin
Successful feedback cases from overseas customers.
Tanfon solar supports distribution business plan all over the world
we will get back to you as soon as possible