This scheme is applicable to the distribution system composed of photovoltaic, energy storage, power load and power grid(generator). The application of the system in the power grid mainly includes the following scenarios:
Place Of Origin: Foshan, Guangdong Province, China
BrandName: Tanfon Solar
MOQ: 1 set,Accpet OEM &ODM
Certificate: TUV, ETL, ISO, CE, RoHS
Payment: T/T, L/C, Paypal, Western Union
industry leading technology
uninterruptible power supply
online service
(TANFON 2.5MW solar energy storage project in Chad)
This scheme is applicable to the distribution system composed of photovoltaic, energy storage, power load and power grid(generator).
The application of the system in the power grid mainly includes the following scenarios:
Peak shaving and valley filling: by charging and storing energy at valley time and discharging energy at peak time, the electricity cost of customers can be reduced and the electricity charge at the power consumption end can be saved for customers.
Demand response: when the short-term power consumption is greater than the transformer capacity, the energy storage system will discharge rapidly to meet the load power demand
Dynamic capacity increase: energy storage equipment is used to replace the capacity of transformer in peak period to help customers reduce and reduce the expansion cycle and cost of transformer investment.
Off grid standby power supply: when the power supply of the power grid is interrupted, provide uninterrupted short-term power supply for important loads to reduce the economic losses caused by sudden power failure of loads.
The solar generation is given priority to the user's load to achieve the maximum economic operation, and the excess energy is stored in the daytime;
When the photovoltaic power generation does not meet the load use, the load is powered by photovoltaic + energy storage; If the photovoltaic + energy storage does not fully meet the use of the load,it will be introduced by the mains to provide reliable power supply for the load; When the solar is redundant and the energy storage battery is full, and the photovoltaic surplus power is sale to grid.
FS550W PERC Shingled solar panel(USA TR Technology panel) |
|
Model: 500KW-4IN*4 Possess multiple protection functions such as voltage loss detection opening, voltage detection closing, overcurrent protection, overvoltage protection, island protection, anti-backflow protection, etc. 4 PCS 200A breaker, 1pcs 800A Breaker |
|
MPPT PV On grid inverter model:125KW*16 MPPT efficiency; >99.9%, Max input voltage :1100V various protection functions; Size:970*640*345mm ,weight:84KG |
|
Pure sine wave 500KW inverter (in the container)*4 3 phase 400V 3W+N+PE 380V/400V,50/60HZ MPPT Efficiency 98% Use copper transformer; Max output current 800Amp Protection against short-circuit, over load, high-voltage and low-voltage protection With ESS extend warranty:5 years |
|
40FT- ESS container soltuion 2.4MWH 716.8V/3360AH Max. Charge Voltage:817.6V Discharge cut-off voltage:627.2V safety discharge current:3360A, safety discharge coefficient:0.5C Size:12192*2438*2591mm Charge Current:1680A Weight:23000KG |
|
The container is mainly composed of double-layer insulation system, monitoring system, fire protection system, access control system, construction wiring of lighting system,equipment frame and other load-bearing frame and bridge;Can be added to the ceiling, reserved ceiling and box link fixed installation location, bulk design, on-site assembly;The equipment is installed on the load bearing frame, which is installed (welded) on the steel bottom plate, and the fixed installation position of the monitoring |
|
Ground rack installation (2pcs in one set bracket) |
|
1)1set battery connect cable ,2*25mm²cable 10M*10PCS 2)4mm² PV cable 6000M, 2*250mm²cable 300M 3)1set MC4 Tools ,terminals and MC4 4)2P1200A switch Box *4pcs,2P100A s witch Box *20pcs 5)on container box all connect cable |
we will get back to you as soon as possible