The King of the Democratic Republic of the Congo has provided a solar energy storage power station system for the village of Bunkeya to meet the electricity needs of 2500 small households in the village. As the village currently lacks access to the grid, the King requested the design of a 1MW solar panel system paired with a 1.8MWh lithium battery storage system to power the entire village.
The first phase of the project will provide electricity to 1,000 households, a school, a hospital, and a military unit. The solar panel installation covers an area of 7,500 square meters.
1760 pieces 600W solar panels
1MW inverter
1.8MWh lithium battery (in a 40-foot container)
500KW diesel generator
1250KVA step-up transformer
200KVA low-voltage transformers and distribution boxes
The project will generate 5.5MWh of electricity per day. The lithium battery can store 1.8MWh of electricity. During the day, solar energy directly carries all village loads; at night, the battery power is used. It is enough for all commercial places and household users connected to the electricity.
1.The location for the solar panels is sufficient and can be adjusted as needed, with preference given to positioning them near the school. From a Google Maps perspective, the village appears trapezoidal in shape, with a distance of approximately 3.12 kilometers from the power station to the farthest household. Therefore, there is no need for a step-up transformer, and low-voltage electricity can be directly distributed to each household.
2.The wiring layout will be confirmed by the local engineer.
3.Since the village is not yet connected to the grid, two 500KW diesel generators will be installed as backup power sources. These can be used to supply power during rainy days or other circumstances.
4.In addition to product sales, we offer on-site installation services and have experience in handling large projects, enabling us to address any construction-related issues effectively. Therefore, all necessary components will be provided.
A delegation representing the King has visited the TANFON factory, assessed its capabilities, and signed a contract on-site. Upon receiving the customer's deposit, we will promptly arrange for the delivery of solar panels, conduct on-site surveys, and provide construction guidance.
If you have similar needs for a solar village system or community solar system, we offer free design and survey services for you.
TANFON industrial and commercial solar energy system has been rigorously tested in tropical areas and works stably 24/7
Welcome to Chad to visit TANFON SOLAR government engineering quality demonstration solar system too.
Suitable for daily power consumption: <6200KWH, Battery storage: 1806KWH, Allowable max loads power: 1MW | ||
Solar panel | TFD600W half cell PERC solar panel(LonGi N type TopCon Solar Cell) Vmp: 43.44V Voc: 51.54V Imp: 13.81A Isc:14.50A Efficiency: 23.22% Size: 2279*1134*30MM Strong anti-cracking advantage 25 years product warranty Connect way :each 16pcs in series. |
1760 pcs |
PV inverter | MPPT PV On grid inverter model:125KW MPPT efficiency; >99.9%, Max input voltage :1100V various protection functions; Size:970*640*345mm ,weight:84KG |
8pcs |
Bidirectional converter | Pure sine wave 500KW inverter (in the container) 3 phase 400V 3W+N+PE 380V/400V,50/60HZ MPPT Efficiency 98% Use copper transformer; Max output current 800Amp Protection against short-circuit, over load, high-voltage and low-voltage protection With ESS extend warranty:5 years |
2pcs
|
Lithium battery | PACK Batteries module: SPEC:280AH 16S1P(14.336KWH) Size:810mm*468mm*235mm Weight:110kg±3kg Output voltage:51.2V Dis/charge current:140A ESS extend warranty: 5years |
126pc
|
EMS system | EMS:Cloud view and remote control We provide the most basic EMS functions, and finally complete the final version according to the customer's requirements |
1set
|
Battery system 40 FT Container | The container is mainly composed of double-layer insulation system 5pcs 3KW Airconditioning , 1set monitoring system, 1set fire protection system, 1set access control system, construction wiring of lighting system,equipment frame and other load-bearing frame and bridge;Can be added to the ceiling, reserved ceiling and box link fixed installation location, bulk design, on-site assembly;The equipment is installed on the load bearing frame, which is installed (welded) on the steel bottom plate, and the fixed installation position of the monitoring |
1set
|
Distribution Cabinet | Distribution Cabinet It contains components such as current sensors, circuit breakers, contactors and protection devices, which are used to monitor and control the flow of current to ensure the safe operation of the system. |
1set
|
Panel rack | Ground rack installation including complete fittings (other type of rack can be customized as perclient's requirement ) |
1set
|
Cables&Accessories | 1)1set battery connect cable ,2*25mm²cable 10M*10PCS 2)4mm² PV cable 4000M, 3*95mm²cable 100M 3)1set MC4 Tools ,terminals and MC4 4)on container box all connect cable |