Diesel generator automatic start function |
||
Original plan | Updated plan | |
Working principle | After the inverter stops inverting, it sends a signal to the diesel generator, and the diesel generator can start to provide power to the inverter load. In this process, the load needs to be turned off in advance, and the load switch can only be turned on after the output of the diesel generator is stable. | When the inverter is inverting, the battery capacity is discharged to a certain extent, and the signal is sent to the diesel generator without stopping the inverter. The diesel generator starts to provide power to the delay control box. The delay control box can be set to 5 After a few minutes, the inverter will be supplied with power. In this process, it is necessary to turn off the load. |
Load power off | need |
unnecessary |
Battery capacity | GEL: 30% (after stopping the inverter) | GEL: 40%+ (no need to stop inverter) |
Inversion status | stop | non-stop |
Switching time | more than 10 seconds | seamless switching |
Difference | No additional cost, human intervention in the entire switching process is required, otherwise the load will be easily burned, or the transformer will be broken |
Modify the program, increase the cost of the control box, and the whole process can be switched automatically without manual operation. |