1.
Usage Scenarios:
The system will be operating continuously in a mining industry setting, providing full-time power.
2.
Load Details:
1.Total Load: Approximately 4 MVA
2.Largest Load: A ball mill rated at 400 kW
3.Load Startup: All loads are started in a staggered manner to manage inrush currents and power surges.

Operating Hours and Schedule:
1.Ball Mill: Operates 24 hours/day
2.Compressors: Operate 24 hours/day, though not all run simultaneously
3.Crushing Plant: Operates 16 hours/day
All equipment runs 7 days a week, ensuring continuous mining operations.


Solar Panel Installation Site:
The solar panels will be installed on a prepared 6-hectare land area (solar farm), rather than on a rooftop.

Existing Backup Power:
There is an existing diesel generator providing backup power, rated at 2 MVA. The generator is currently on-site and available as needed.


Energy Consumption & Diesel Usage:
The diesel generator currently runs less than 60 hours per month. Under full load, it consumes approximately 320 liters/hour.


1.Conversion: 320L of diesel = approximately 1,280 kWh
2.Daily Consumption at Full Load: 320L/h × 24h = 7,680L/day
7,680L/day × (1,280 kWh/320L) = 30,720 kWh/day
Given about 6 hours of effective daily sunshine, a solar system sized at approximately 5 MW (5,120 kW) is suitable to meet these energy demands and significantly reduce diesel dependency.

This design case highlights the operational requirements of a mining facility, its continuous load demands, and the optimal solar system sizing (around 5 MW) to offset the current diesel consumption and provide a more sustainable energy solution.

 

5MW on&off grid solar power system
Suitable for daily power consumption : <31680KWH, Battery storage:9031KWH, Allowable max loads power : 5MW Qty

Solar panel
TFD600W half cell PERC solar panel(LonGi N type TopCon Solar Cell) 
Vmp: 43.44V  Voc: 51.54V  Imp: 13.81A  Isc:14.50A
Efficiency: 23.22%   Size: 2279*1134*30MM
Strong anti-cracking advantage 25 years product warranty
Connect way :each 16pcs in series.
8800pcs

PV inverter
MPPT PV On grid inverter model:125KW
MPPT efficiency; >99.9%,
Max input voltage :1100V
various protection functions;
Size:970*640*345mm ,weight:84KG
40pcs

Bidirectional converter
   

Pure sine wave 500KW inverter (in the container)
3 phase 400V 3W+N+PE 380V/400V,50/60HZ
MPPT Efficiency 98%
Use copper transformer; Max output current 800Amp
Protection against short-circuit, over load, high-voltage and low-voltage protection
With ESS  extend warranty:5 years
10pcs
 

Lithium battery
 PACK Batteries module:
SPEC:280AH 16S1P(14.336KWH)
Size:810mm*468mm*235mm
Weight:110kg±3kg
Output voltage:51.2V
Dis/charge current:140A
ESS extend warranty: 5years
630pc

EMS system
EMS:Cloud view and remote control
We provide the most basic EMS functions,
and finally complete the final version
according to the customer's requirements
1set

Battery system 40 FT-Container
The container is mainly composed of double-layer insulation system 10pcs  3KW Air-conditioning , 1set monitoring system, 1set fire protection system, 1set access control system, construction wiring of lighting
system,equipment frame and other load-bearing frame and bridge;Can be added to the ceiling, reserved ceiling and box link fixed installation location, bulk design, on-site assembly;The equipment is installed on the load bearing frame, which is installed (welded) on the steel bottom plate, and the fixed installation position of the monitoring
5set

Distribution Cabinet
Distribution Cabinet
It contains components such as current sensors, circuit breakers, contactors and protection devices, which are used to monitor and control the flow of current to ensure the safe operation of the system.
1set

Panel rack
Ground rack installation
including complete fittings
(other type of rack can be customized as perclient's requirement )
1set

Cables&Accessories
1)pv inverter to combiner cables 4*95mm2 -4000M
2)4mm² PV cable 14000M, PCS cables to combiner 4*240mm2-150M
3)From low cabinet to high voltage cabinet cable 3*100mm2-600M
4)Project PV cable Tray & Lightning protection system
1pc
<

TANFON SOLAR: Cooperation with Nigerian Senator MR.MORO

8MW Solar System for City TINE, Valued by President of Chad

Tanfon Solar IoT APP

China Safety Solar system Leading Brand

Dealer Policy

Tanfon 200KW solar power project in Papua New Guinea installation

loading