TANFON solar supply and installation of a solar energy system to the student accommodation facility along Great East Road
in Jesmondine area of Lusaka, right across the University of Zambia (UNZA) main
campus.
This system will provide backup power for lighting and common area
sockets, with an estimated energy requirement of 50KW and 100KW.
1. Scope of Work
• Supply and installation of a backup solar power system that meets the
specified energy needs.
• The installed system must ensure compatibility with existing infrastructure
for lighting and common area sockets.
• The solar system must serve as a backup system when electricity system
fail, the connection must take this into account.
• The solar panels shall be installed on the existing roof top.
2. Energy Requirements
• The system should have a capacity between 50KW and 100KW.
3.install support
EPC construction guidance service
1). Determine the installation direction of the solar panels.
2). Instruct how to hoist the equipment.
3). Supervise local installers to strictly follow the requirements to lay out the lines
Technical training
a. Teach on-site users the whole set of solar system power on and off training
b. Train troubleshooting, emergency methods, and maintenance methods.
C. Train product users
Irregular return visits
Chinese engineers will make online and on-site return visits to the project from time to time to ensure that on-site users understand the product technology and usage technology of the solar system
TANFON can solve your design, installation, and after-sales problems.
Train your operation and maintenance personnel, and help you operate and maintain your solar energy system online for free for 5 years.
Regularly check the solar panel power generation data, lithium battery charge and discharge data, and inverter output power data to ensure that the entire solar energy system can have a more stable efficiency output and extend the service life of the solar power generation system.