This is a luxurious hotel that is nearing completion in UYO. It already has an independent transformer rated at 350KVA and a 250KVA diesel generator installed. The client is interested in purchasing a solar power system for the following reasons: unstable grid electricity supply and the desire to use solar power when there is no grid power available; the diesel generator would only be used as a backup. The noise generated by the diesel generator is too loud and affects the overall environment of the hotel.
The available area for solar panel installation is 1000 square meters, and the roof has an aluminum structure for mounting. The two buildings in total have 78 units of 1.5HP air conditioners and 11 units of 3HP air conditioners. The transformer has a grounding system, which simplifies the layout of the electrical lines.
After discussing with the hotel's electrician, we have designed a 250KW solar power system. We will also have local engineers from Nigeria to install this system. If you have a similar hotel project, feel free to consult the TANFON team for assistance.
Portugal 20KW off grid solar power system
Government Hospital Tender Solar Power Project in Kenya
Partnering with the Chadian Ministry of Health to Bring Reliable Solar Solutions